|
CONSTRUCTION REQUIREMENTS
- Foundation Plan showing the new accessory/alteration
building footprint
- Floor Plan showing the new accessory/alteration
wall partitions and location of doors and windows.
- Wall Section detailed drawings showing materials,
footers, foundation, wall and roof of structure.
(Example attached)
- Building elevation drawing showing appearance
of completed construction
PERMITS ARE ISSUED MONDAY THRU
FRIDAY
WITH A MINIMUM FIVE (5) BUSINESS DAY TURN-AROUND
|